Deterministic Consent Gate: analytics remain disabled until explicit opt-in. No third-party trackers are loaded.

Specificatie van leveringsartefact

DORA control implementation matrix

DORA Landing Zone

DORA control implementation matrix defines the delivery artifact specification for DORA Landing Zone, including structure, evidence expectations, and approval boundaries.

DORANIS2

Doel

Provide a reviewable artifact that proves DORA Landing Zone implementation quality for stakeholders, operators, and assurance teams.

Scopecontext

Continuity-oriented platform baseline with resilience checkpoints in each release gate.

Invoer

- Approved implementation scope and stakeholder requirements

- Source architecture and policy configuration snapshots

- Validation results, test outcomes, and governance notes

Uitvoer

- Versioned artifact document with ownership metadata

- Traceability links to controls, decisions, and evidence

- Sign-off checkpoint for founder or delegated approver

Acceptatiecriteria

- Artifact is complete, unambiguous, and reproducible

- All referenced controls and evidence links resolve

- Final sign-off status and revision history are visible

Compliance-bewijsnotities

- [DORA] Artifact contains evidence section for domain-specific assurance

- [NIS2] Artifact contains evidence section for domain-specific assurance

Specificatieschema

Eigenaarsrol

Delivery Lead with Founder oversight

Goedkeuringssign-off

Founder or delegated Control Plane Principal

Versioneringsbeleid

Semantic revisioning (major.minor.patch) with immutable change log

Reviewcadans

Weekly during rollout, monthly after stabilization

Bewijsretentie

Minimum 24 months or regulatory minimum, whichever is longer

Verplichte secties

- Document objective and decision context

- Scope boundary with included and excluded systems

- Implementation specification and control mapping

- Evidence references and verification results

- Risks, exceptions, and next remediation actions